1. Introduction
Farhan Builders is a professional construction company committed to delivering high-quality construction projects with safety, efficiency, and client satisfaction. The work procedure of Farhan Builders is designed to ensure systematic planning, proper execution, quality control, and timely completion of projects. By following structured procedures, the company ensures transparency, accountability, and excellence in every stage of construction.
2. Project Acquisition and Contract Award
The work procedure of Farhan Builders begins with project acquisition. Projects may be obtained through government tenders or private clients.
This stage includes:
Reviewing tender documents and drawings
Studying BOQ (Bill of Quantities)
Conducting site visits
Preparing cost estimates and schedules
Submitting bids and negotiating terms
Signing the construction contract
After contract award, the project is officially initiated.
3. Planning and Project Scheduling
Proper planning is the foundation of every successful project at Farhan Builders.
Planning activities include:
Developing a detailed project schedule
Defining work phases and milestones
Resource planning (labor, machinery, materials)
Budget preparation and cost control planning
Risk assessment and mitigation strategies
Effective planning helps minimize delays and cost overruns.
4. Site Mobilization
Once planning is approved, Farhan Builders mobilizes resources to the site.
Site mobilization includes:
Establishment of site office
Arrangement of water, electricity, and sanitation
Deployment of machinery and equipment
Setting up material storage areas
Providing site security and safety signage
This stage prepares the site for smooth construction activities.
5. Survey, Setting Out, and Layout
Accurate survey and layout work is essential to avoid structural errors.
This process includes:
Verification of plot boundaries
Level checking and benchmarks establishment
Marking of building layout as per drawings
Approval of layout before execution
Proper setting out ensures accuracy and structural integrity.
6. Excavation and Foundation Work
Foundation work is one of the most critical stages of construction.
Foundation activities include:
Excavation according to approved drawings
Soil inspection and compaction
PCC (Plain Cement Concrete)
Footing and foundation concrete works
Proper curing and inspection
Strong foundations ensure long-term durability of the structure.
7. Structural Construction Work
Farhan Builders executes structural works with strict quality standards.
Structural work includes:
Reinforcement steel fixing
Shuttering and formwork
Casting of columns, beams, and slabs
Concrete pouring and curing
Quality testing of materials
This stage determines the strength and stability of the building.
8. Masonry and Block Work
After structural completion, masonry work is carried out.
Masonry work includes:
Brick or block laying
Alignment and level checking
Construction of partition walls
Installation of lintels and sunshades
This stage gives shape to the building layout.
9. Electrical, Plumbing, and Mechanical Works
Service works are executed carefully to ensure functionality and safety.
Services include:
Electrical conduits and wiring
Plumbing and drainage pipelines
Sewerage and water supply systems
Mechanical and HVAC installations
All service works are tested before finishing begins.
10. Plastering and Finishing Works
Finishing works enhance the appearance and usability of the structure.
Finishing activities include:
Internal and external plastering
Flooring and tiling works
Installation of doors and windows
Painting and polishing
Ceiling and fixture installations
Quality finishing reflects the professional standards of Farhan Builders.
11. Quality Control and Safety Management
Farhan Builders strictly follows quality and safety standards on all projects.
Quality and safety measures include:
Material testing and inspection
Regular site supervision
Use of safety helmets, shoes, and PPE
Safety training and toolbox meetings
Compliance with safety regulations
Safety is treated as a top priority to prevent accidents.
12. Monitoring, Reporting, and Coordination
Project progress is continuously monitored and documented.
Monitoring includes:
Daily progress reports
Weekly and monthly reviews
Labor and machinery records
Cost and material tracking
Issue identification and resolution
Proper reporting ensures transparency and control.
13. Project Completion and Handover
After completion, Farhan Builders conducts final inspections before handover.
Handover process includes:
Final quality inspection
Rectification of snags
Completion documentation
Client approval and satisfaction
Site demobilization
Projects are handed over only after meeting all contractual requirements.
Conclusion
The work procedure of Farhan Builders is a well-defined and professional system that ensures quality construction, safety, and timely project delivery. By following proper planning, skilled execution, continuous monitoring, and strict quality control, Farhan Builders maintains its reputation as a reliable and trusted construction company. These procedures help the company achieve long-term success and client satisfaction.