1. Introduction
Farhan Builders is a professional construction company committed to delivering high-quality construction projects with safety, efficiency, and client satisfaction. The work procedure of Farhan Builders is designed to ensure systematic planning, proper execution, quality control, and timely completion of projects. By following structured procedures, the company ensures transparency, accountability, and excellence in every stage of construction.

2. Project Acquisition and Contract Award
The work procedure of Farhan Builders begins with project acquisition. Projects may be obtained through government tenders or private clients.
This stage includes:
  • Reviewing tender documents and drawings
  • Studying BOQ (Bill of Quantities)
  • Conducting site visits
  • Preparing cost estimates and schedules
  • Submitting bids and negotiating terms
  • Signing the construction contract
After contract award, the project is officially initiated.

3. Planning and Project Scheduling
Proper planning is the foundation of every successful project at Farhan Builders.
Planning activities include:
  • Developing a detailed project schedule
  • Defining work phases and milestones
  • Resource planning (labor, machinery, materials)
  • Budget preparation and cost control planning
  • Risk assessment and mitigation strategies
Effective planning helps minimize delays and cost overruns.

4. Site Mobilization
Once planning is approved, Farhan Builders mobilizes resources to the site.
Site mobilization includes:
  • Establishment of site office
  • Arrangement of water, electricity, and sanitation
  • Deployment of machinery and equipment
  • Setting up material storage areas
  • Providing site security and safety signage
This stage prepares the site for smooth construction activities.

5. Survey, Setting Out, and Layout
Accurate survey and layout work is essential to avoid structural errors.
This process includes:
  • Verification of plot boundaries
  • Level checking and benchmarks establishment
  • Marking of building layout as per drawings
  • Approval of layout before execution
Proper setting out ensures accuracy and structural integrity.

6. Excavation and Foundation Work
Foundation work is one of the most critical stages of construction.
Foundation activities include:
  • Excavation according to approved drawings
  • Soil inspection and compaction
  • PCC (Plain Cement Concrete)
  • Footing and foundation concrete works
  • Proper curing and inspection
Strong foundations ensure long-term durability of the structure.

7. Structural Construction Work
Farhan Builders executes structural works with strict quality standards.
Structural work includes:
  • Reinforcement steel fixing
  • Shuttering and formwork
  • Casting of columns, beams, and slabs
  • Concrete pouring and curing
  • Quality testing of materials
This stage determines the strength and stability of the building.

8. Masonry and Block Work
After structural completion, masonry work is carried out.
Masonry work includes:
  • Brick or block laying
  • Alignment and level checking
  • Construction of partition walls
  • Installation of lintels and sunshades
This stage gives shape to the building layout.

9. Electrical, Plumbing, and Mechanical Works
Service works are executed carefully to ensure functionality and safety.
Services include:
  • Electrical conduits and wiring
  • Plumbing and drainage pipelines
  • Sewerage and water supply systems
  • Mechanical and HVAC installations
All service works are tested before finishing begins.

10. Plastering and Finishing Works
Finishing works enhance the appearance and usability of the structure.
Finishing activities include:
  • Internal and external plastering
  • Flooring and tiling works
  • Installation of doors and windows
  • Painting and polishing
  • Ceiling and fixture installations
Quality finishing reflects the professional standards of Farhan Builders.

11. Quality Control and Safety Management
Farhan Builders strictly follows quality and safety standards on all projects.
Quality and safety measures include:
  • Material testing and inspection
  • Regular site supervision
  • Use of safety helmets, shoes, and PPE
  • Safety training and toolbox meetings
  • Compliance with safety regulations
Safety is treated as a top priority to prevent accidents.

12. Monitoring, Reporting, and Coordination
Project progress is continuously monitored and documented.
Monitoring includes:
  • Daily progress reports
  • Weekly and monthly reviews
  • Labor and machinery records
  • Cost and material tracking
  • Issue identification and resolution
Proper reporting ensures transparency and control.

13. Project Completion and Handover
After completion, Farhan Builders conducts final inspections before handover.
Handover process includes:
  • Final quality inspection
  • Rectification of snags
  • Completion documentation
  • Client approval and satisfaction
  • Site demobilization
Projects are handed over only after meeting all contractual requirements.

Conclusion
The work procedure of Farhan Builders is a well-defined and professional system that ensures quality construction, safety, and timely project delivery. By following proper planning, skilled execution, continuous monitoring, and strict quality control, Farhan Builders maintains its reputation as a reliable and trusted construction company. These procedures help the company achieve long-term success and client satisfaction.
458

satisfied clients

© Copyright 2026 All Rights Reserved. Developed by Ikreate Themes
    • About us
    • Home
    • work procedure
Book Now
example@example.com
Quick Questions? Email Us
Talk to an Expert (Aradia)
(555)-555-5555
123 Main Street, Springfield, USA
Office Address